HEAVY LIFTING & TUNNEL CONSTRUCTION EQUIPMENT
Crawler Crane
- Heavy Lifting Capacity up to 1,000 Tons
- Specialized in TBM Assembly & Tunnel Segment Installation
- Stable Crawler Chassis for Soft & Uneven Ground
Crawler Crane
The Crawler Crane is one of the heaviest lifting equipment in civil and tunneling operations, specifically designed for heavy-duty lifting tasks. Its most prominent role lies in tunneling projects, where it handles the heavy lifting of TBM components, precast tunnel segments, and specialized tunneling machinery, providing the muscle and precision required at the heart of major infrastructure projects.
- Technical Specifications
| Parameter | Value |
|---|---|
| Lifting Capacity | 50 to 1,000 tons |
| Chassis Type | Crawler |
| Boom Length | Up to 100 m |
| Control System | Hydraulic / Electronic |
| Power Source | Diesel |
| Boom Height | 20 to 120 m |
- Key Features & Benefits
- Lifting capacities from 50 up to 1,000 tons make it the workhorse for the heaviest lifts on major projects.
- Purpose-built workflow support for TBM component handling and tunnel segment installation.
- Wide crawler tracks distribute ground pressure evenly, ensuring safe operation on soft or uneven terrain without outriggers.
- Boom lengths of up to 100 m and hook heights of up to 120 m provide reach for large-scale lifting scenarios.